The Energy Showcase

A Pioneering Solar House

Services

 

Digital StillCamera

Incoming services entry in the porch. The yellow pipe is LPG.

Digital StillCamera

Insulated hot and cold plumbing and galvanised ventilation duct.

Digital StillCamera

Hot and cold bath plumbing behind the false wall, followed by high levels of insulation.

Digital StillCamera

The start of the installation of the wall-mounted WC in the bathroom.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Digital StillCamera

Construction of the glass tube heat exchanger.

 

 

Digital StillCamera

… Followed by insulation with ‘seconds’-grade phenolic foam slabs.

 

 

 

 

 

 

 

 

 

 

Digital StillCamera

PVC-free, screened electrical cable being fitted in hardwood-faced trunking.

Digital StillCamera

In places on the first floor, cabling was routed within door frames or below timber wall cladding.

 

 

 

 

 

 

 

 

Digital StillCamera

Some first floor cabling is routed between the battens and below the T&G timber boarding.

 

 

 

 

 

See Interior Design for examples of the finished appearance.

 

 

 

BT’s very strange view of a ‘satisfactory’ cable installation
at the telephone pole in the garden.

Digital StillCamera

 

Advertisements